Skip to content
Solar Farm Facts
- 563 kilowatt (kW) Solar photovoltaic (PV) System
- Online: October 2018
- Footprint: 3 acres Golden Valley Electric Association (GVEA) Solar Graphic
- Contractor: ABS Alaskan, Inc.
- Panel manufacturer: CSUN
- Each of the 1,760 panels will generate up to 320 watts.
- Contractor: ABS Alaskan, Inc.
- Cost: $850,000 after a $225,000 grant supplied from United States Department of Agriculture (USDA) Rural Energy for America Program (REAP)
- Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kilowatt-hours (kWh) per month)
- Located on GVEA property next to BESS and Wilson Substation – Visible from VanHorn Road
Crown-Sports-app-support@a220149.com
Online-gambling-platform-info@greatsellmall.com
Complete-gambling-platform-contactus@free-9.com
Gaming-platform-website-marketing@abe-men.com
郑州成功财经学院
广州天气
修水网
威尼斯人平台
玩家网
Crown-Sports-Betting-contactus@personelyakakarti.com
Macau-New-Portuguese-capital-support@zxunweb.com
Perimeter-football-feedback@propertyhunter-realty.com
天使之恋Online官方网
众神争霸-官方网站
QQ360真人秀
博彩平台网址大全
环球56在线
Gaming-app-Download-hr@petulantrumblings.com
《赤壁》官方论坛
在线博彩
明波通信
前程人力
游戏吧
欧派家居集团股份有限公司
中江种业
《苍穹变》手游官网
报警器
《放开那三国》-官方网站
丰城房地产网
任丘华油信息网
i尚漫
高唐网
站点地图